YOUR BUSINESS AUTHORITY

Springfield, MO

Log in Subscribe

Summer 2019 Construction in the Ozarks: Mystic River Falls

399 Silver Dollar City Parkway, Branson

Posted online

General contractor: Silver Dollar City Maintenance and Construction Department
Size: 152,460 square feet [development footprint]
Estimated cost: $23 million
Estimated completion: Summer 2020
Project description: Herschend Family Entertainment Corp. is bringing a new attraction next summer to Silver Dollar City. Mystic River Falls replaces the demolished Lost River of the Ozarks. The nearly half-mile-long ride features a 45-foot drop, reputedly the tallest raft ride drop in the Western Hemisphere, SDC President Brad Thomas said. The setting will feature natural rock and plant landscaping throughout. Herschend Family Entertainment is the project architect, with Ride Engineers Switzerland (Altendorf, Switzerland) leading the engineering work for the ride. Additional engineering work is provided by Barr Engineering Co. (Minneapolis) and J&M Engineering LLC, structural; and Interpres Building Solutions LLC, mechanical, electrical and plumbing.

Comments

No comments on this story |
Please log in to add your comment
Editors' Pick
Tariffs a question mark for local ag producers

While a disruption in international trade has the capacity to hurt local farmers and ranchers, beef producers are having a good go of things at the moment.

Most Read
SBJ.net Poll
How do you feel about the city of Springfield's new elected leadership?

*

View results

Update cookies preferences