YOUR BUSINESS AUTHORITY
Springfield, MO
Preliminary work has begun for the construction of a new six-lane Route MM bridge over Interstate 44 at Leb-anon, according to a news release from the Missouri Department of Transporta-tion.
The Missouri Highways and Transpor-tation Commission awarded the contract for the project to the low bidder, Emery Sapp & Sons Inc. of Columbia.
The company will build the bridge for $3,745,536.
Representatives of the contractor told MoDOT officials they are aiming for mid-August to open the new bridge to traffic, and the target date for completion of the entire project is Oct. 15, the re-lease stated.
The new bridge will be 254 feet long and 100 feet wide.
The old two-lane bridge, built in the 1950s during the time when Route 66 was popular, was damaged beyond repair last year when a steel tank being hauled east on I-44 hit its under side and bent its steel girders.
The new bridge is about 7 feet higher than the old bridge, which was 180 feet long.
Nixa Superintendent Gearl Loden weighs in on A-F grade cards.
SBJ announces executive newsroom hires
Thanksgiving staple recalled at Costco
HBA of Greater Springfield executive officer to retire
Timeshare exit company owner sentenced for tax evasion
Warren Buffett donates $5.5B worth of Berkshire Hathaway shares
Letter to the Editor: No half-baked cake for our kids. No half-baked school grades, either.