YOUR BUSINESS AUTHORITY
Springfield, MO
Location: Waynesville
Project owner: Waynesville R-VI School District
Contractor: KCI Construction, Lebanon
Estimated cost: $20.1 million
Estimated completion date: Fall 2003
This multilevel facility will comprise 242,614 square feet and will serve 1,800 high school students in grades nine through 12. The main entrance opens into a large commons area with a grand stair hall, a vaulted ceiling and a skylight.
The facility has more than 70 classrooms in the building with several computer and academic labs. The fine arts wing will house music, art and drama classrooms and a 20,000-square-foot auditorium that will seat 752 spectators. Other features include two gymnasiums, a mezzanine with an indoor walking track, an outdoor dining patio adjacent to the cafeteria and an 11,300-square-foot media center with an outdoor balcony.
This installment of Springfield Business Journal’s Architects & Engineers Project Report showcases 26 endeavors by area design and engineering professionals.
Longtime employee sues Ozarks Tech, alleges retaliation
Cavender’s opens hat shop in southeast Springfield
Eric Schmitt introduces Modern Skies Act
Caterpillar to acquire John Fabick Tractor Co.
Springfield airport to cut the ribbon on $35M in construction projects
Legacy Bank accused in lawsuit of failing to protect customers in data breach