General contractor: Metro Design & Construction Inc.
Architect: Hight-Jackson Associates PA of Rogers, Ark.
Engineers: Fredeen Group Inc. of Rogers, civil; Tatum Smith Engineers Inc. of Rogers, structural; and HSA Engineering Consultants Inc. of Fort Smith, Ark.; mechanical and electrical
Estimated cost: $2 million
Arvest's first Hollister branch is slated for completion in November, according to Greg Baker, the bank's market president for the Branson-Hollister area. The 4,000-square-foot bank will be a full-service branch with a drive-through window, Baker said. Excavation was provided by Miller-Blevins Excavating of Reeds Spring. Local contractors for the Hollister branch include Harris Mechanical LLC and MC Electric Inc.[[In-content Ad]]