YOUR BUSINESS AUTHORITY
Springfield, MO
General contractor: Snyder Construction Group LLC
Size: Not applicable
Cost: Would not disclose
Estimated completion: April 2024
Project description: A facade upgrade to this shopping center includes the removal of an existing canopy, sidewalks and curb islands and the installation of new footings, structural steel and metal stud framing, an aluminum storefront system and exterior treatments to provide an updated look, officials say. A new 30-foot promenade is planned with benches, light posts, a courtyard and bioswales, along with parking lot updates. Boti Architects LLC is project architect and mechanical, electrical and plumbing engineer, while Own Inc. handled the civil engineering and Wells & Scaletty LLC performed the structural work.
Nixa Superintendent Gearl Loden weighs in on A-F grade cards.
Thanksgiving staple recalled at Costco
HBA of Greater Springfield executive officer to retire
Warren Buffett donates $5.5B worth of Berkshire Hathaway shares
Transportation officials discuss $471M Forward 44 initiative
Letter to the Editor: No half-baked cake for our kids. No half-baked school grades, either.
Ozarks Farm Stop remains open after car crashes into building