Springfield, MO
Location: 651 N. Boonville Ave.
Project owner: Gannett
Co. Inc.
Contractor: DeWitt and Associates
Estimated cost: $6 million
Completion date: June 2002
With 775,000 cubic feet of space and a height of 60 feet, the new press hall comprises 32,000 square feet. One challenge of the project was designing the press hall's mechanical room on top of the News-Leader's existing distribution dock. The press hall's mechanical support systems heating, cooling, plumbing and compressed air are fully redundant and are engineered to keep the press operating at full capacity even if 50 percent of the mechanical support facilities fail. The offset press requires a fully controlled climate at all times to operate at peak efficiency. Special registers at different levels introduce high quantities of conditioned air, which minimizes disturbance of the newspaper webs running through the press. Special automatic ink filters were installed to prevent the ink mist generated by the press operation from returning and damaging the press.
This installment of Springfield Business Journal’s Architects & Engineers Project Report showcases 26 endeavors by area design and engineering professionals.
Longtime employee sues Ozarks Tech, alleges retaliation
Cavender’s opens hat shop in southeast Springfield
Eric Schmitt introduces Modern Skies Act
Caterpillar to acquire John Fabick Tractor Co.
Springfield airport to cut the ribbon on $35M in construction projects
Legacy Bank accused in lawsuit of failing to protect customers in data breach