YOUR BUSINESS AUTHORITY
Springfield, MO
General contractor: Killian Construction Co.
Size: 133,000 square feet
Cost: $22.6 million
Estimated completion: March 2026
Project description: PTG Missouri LLC is building a new Premier Truck Group sales and repair facility to replace one located in north Springfield. The building will include sales, parts storage and service areas mostly located on the ground level with additional storage on a mezzanine level. The front-facing sections of the building are being constructed out of precast concrete with metal-clad and glazed entry points, though the majority of the square footage will be a preengineered metal building shop for truck service at the rear. Architect is Ware Malcomb Inc. (Chicago), and engineers are CJW Transportation Consultants LLC, civil; Caruso Turley Scott Inc. (Tempe, Arizona), structural; Sazan Group Inc. (Tempe, Arizona), mechanical, electrical and plumbing; and Terracon Consultants Inc., geotechnical.
This installment of Springfield Business Journal’s Architects & Engineers Project Report showcases 26 endeavors by area design and engineering professionals.
Longtime employee sues Ozarks Tech, alleges retaliation
Cavender’s opens hat shop in southeast Springfield
Eric Schmitt introduces Modern Skies Act
Caterpillar to acquire John Fabick Tractor Co.
Springfield airport to cut the ribbon on $35M in construction projects
Legacy Bank accused in lawsuit of failing to protect customers in data breach