YOUR BUSINESS AUTHORITY
Springfield, MO
General contractor: Killian Construction Co.
Size: 29,065 square feet
Estimated cost: $8.3 million
Estimated completion: January 2025
Project description: On the site of the former Springfield-Branson National Airport terminal, a two-story preengineered metal building will include Ozarks Technical Community College class and training rooms alongside hangar space for hands-on aviation maintenance instruction. The facility will include two labs, four classrooms and an observation tower overlooking the runway, project officials say, allowing students to learn to service all parts of an aircraft. Including construction expenses, the total project cost is $13.2 million. The project architect is nForm Architecture LLC, with frankZdesign LLC as landscape architect. Engineers are Crawford, Murphy & Tilly Inc., civil and structural; and Interpres Building Solutions LLC, mechanical, electrical and plumbing.
Nixa Superintendent Gearl Loden weighs in on A-F grade cards.
Thanksgiving staple recalled at Costco
HBA of Greater Springfield executive officer to retire
Warren Buffett donates $5.5B worth of Berkshire Hathaway shares
Transportation officials discuss $471M Forward 44 initiative
Letter to the Editor: No half-baked cake for our kids. No half-baked school grades, either.
Ozarks Farm Stop remains open after car crashes into building