YOUR BUSINESS AUTHORITY
Springfield, MO

Owner/developer: Springfield Art Museum/City of Springfield
General contractor: Rich Kramer Construction Inc.
Architect: Paul Marti Associates Architects (St. Louis); Marshall-Waters-Woody Associates Inc.
Engineers: Anderson Engineering Inc., civil; Larson Engineering (St. Louis), structural; McClure Engineering (St. Louis), mechanical, electrical and plumbing
Size: 9,896-square-foot addition
Estimated cost: $3.5 million
Lender: None
Estimated completion date: June
Project description: This addition to the 35,000-square-foot Springfield Art Museum is being funded through donations, including a $200,000 gift from Southwest Missouri Museum Associates. Additions include a gift shop, library, entrance hall, restrooms and three galleries, according to museum Director Jerry Berger. The new space will be climate-controlled to help preserve the museum’s 9,000-piece, $5 million collection. Future renovations could include heating, ventilation and air-conditioning upgrades to the existing building, which was constructed in 1958.
Reporter Cory Smith brings you new projects each week. He may be reached by e-mail at csmith@sbj.net, by fax at (417) 799-0603 or by phone at (417) 616-5854.
Project work in Springfield corridor will continue into 2031.
Thanksgiving staple recalled at Costco
HBA of Greater Springfield executive officer to retire
Warren Buffett donates $5.5B worth of Berkshire Hathaway shares
Transportation officials discuss $471M Forward 44 initiative
Monday Morning Business Leads: Nov. 16, 2026
Ozarks Farm Stop remains open after car crashes into building
Letter to the Editor: No half-baked cake for our kids. No half-baked school grades, either.