Owner/developer: James River Assembly of God Inc.
General contractor: J.E. Dunn Construction Co.
Architect: Buxton Kubik Dodd Creative
Engineers: Anderson Engineering Inc., civil; Miller Engineering PC, structural; Smith-Goth Engineers Inc., mechanical, electrical and plumbing
Size: 108,748 square feet
Estimated cost: $14 million
Lender: Empire Bank
Estimated completion date: April 2013
Project description: Leevon Grant, project manager with J.E. Dunn Construction, said the project includes a full renovation of the 30,000-square-foot existing church facility. James River Director of Operations Todd Yearack said the 1,400-seat main sanctuary would resemble a theater, with three large video screens to stream sermons from the Ozark campus. Other features of the church – formerly dubbed the James River Wilson’s Creek campus – include an interactive kiosk that will have video monitors in designated areas where parents can check on their children electronically.
Send project info to bbrown@sbj.net.[[In-content Ad]]