YOUR BUSINESS AUTHORITY
Springfield, MO
General Contractor: Shelenhamer Construction
Architect: Sapp Design Associates Architects PC
Engineers: Scott Consulting Engineers PC, civil and structural; Malone Finkle Eckhardt & Collins Inc., mechanical, electrical and plumbing
Size: 10,670 square feet
Estimated cost: $1.89 million
Lender: None
Estimated completion date: Fall
Project description: Fire Station No. 12 is designated as the hazardous materials response team station for the Springfield Fire Department. The facility includes an 812-square-foot community room.
The building is constructed out of masonry and EIFS – exterior insulation finish systems – veneer with metal studs and wood trusses. The new station serves residents in the district east of U.S. Highway 65. Four firefighters will be assigned to the station 24 hours a day, seven days a week, Assistant Fire Chief Steve Hoerning said. Funding comes from the level property tax referendum approved by Springfield voters in February 2004.
—Compiled by SBJ Intern Laura King.
Reporter Cory Smith brings you new projects each week. He may be reached by e-mail at csmith@sbj.net, by fax at (417) 799-0603 or by phone at (417) 831-3238.[[In-content Ad]]