Description: Hood-Rich Inc. is the architect and the structural engineer for renovations and an addition at Campbell United Methodist Church. Smith-Goth Engineers Inc. is the HVAC, electrical and plumbing engineer. A 1,200-square-foot entry and reception area with 20-foot ceilings will extend south from the existing main entry. Planting areas will be on each side of the addition. Renovations include a reception area with a 10-foot cross and flame and a new large gathering area. A cry room will be incorporated into the existing sanctuary, and the present cry room will be converted into offices for the child development center program. A self-serve coffee and juice area also will be added. Completion is slated for January.[[In-content Ad]]